I think the Phase 2 and beyond people had to put 5% down to get started, most VantagePointe buys are now in escrow and will need to put another 5% down when the building is topped out.
The $5,000 deposit was to reserve a unit, once the escrow opened the buyer needed to deposit more funds to reach 5%.
At this point I doubt that construction would stop on the project.